1 00:00:01,990 --> 00:00:02,680 \h Tim Dunn/NASA Launch Manager: Attention all stations. 2 00:00:02,680 --> 00:00:10,370 \h This is the NLM on the NLM net. We are in good configuration with the launch vehicle. 3 00:00:10,370 --> 00:00:16,150 \h Entire prop loading is complete. Booster LO2 loading is complete. 4 00:00:16,150 --> 00:00:20,160 \h Range is green. Weather is acceptable at this time. 5 00:00:20,160 --> 00:00:26,540 \h I would now like to conduct the final launch readiness and spacecraft configured for launch poll. NASA CE? 6 00:00:26,540 --> 00:00:29,500 \h James Wood/NASA Chief Engineer: NASA CE go. Tim Dunn/NASA Launch Manager: SMA? 7 00:00:29,500 --> 00:00:32,220 \h Rick Boutin/NASA Safety and Mission Assurance: SMA's go. Tim Dunn/NASA Launch Manager: SMD? 8 00:00:32,220 --> 00:00:34,830 \h Jeff Gramling/NASA Spacecraft Mission Director: SMD is go. Tim Dunn/NASA Launch Manager: NASA MM? 9 00:00:34,830 --> 00:00:36,650 \h Diana Calero/NASA Mission Manager: NASA MM is go. Tim Dunn/NASA Launch Manager: NAM?